Playground Upgrades

Nightcliff Foreshore Playground (Aralia Street)

Thanks to everyone who responded to our survey about the playground upgrade. New equipment will be installed in mid-April 2017.

Here's a sneak preview of what is on its way.

Mazlin Park, Wanguri

The Neighbourhood park playground in Wanguri between Mazlin street and Weedon street is being upgraded. New play equipment and a shade structure will be installed next year (planned for July 2017).

We recently asked to hear from park users and residents about what elements they would like to see included in the upgraded playground. Thank you for all the feedback provided, this will be used to inform the design of the playground.

Sunset Park Upgrade

The Sunset Park playground upgrade is now complete. 

The small junior play slide and climbing structure was replaced with this larger structure.

This great new play combination offers a variety of physically developing play activities.

 

Whittle Park, Karama   Playground Upgrade

The playground upgrade in Whittle Park, Karama is now complete and all areas of the playground is fully accessible.

A new shade structure has been installed over the playground. 

The Community was consulted in July 2016 on the new playground equipment.

Anula Regional Playground in Yanyula Park Update September 2016

This fabulous playground is now complete. All areas are now open. 

 

Dwyer Park, The Narrows

The Dwyer Park Consultation was completed last year. Thank you to all the people who provided input, this will be used in developing the design of the new playground.

At the same time the Northern Territory Government has been planning works to reduce flooding during high rainfall events in the suburbs of the Narrows and Ludmilla. As part of these works, drainage will be improved in Dwyer Park, and to the trunk drains along Reichardt and Benison Road that convey flows to Sadgroves Creek.

To minimise disruption to residents, City of Darwin will construct the new playground in coordination with the delivery of the flood mitigation works within Dwyer Park. It is anticipated that the flood mitigation works for the Ludmilla catchment will start during the 2016 dry season and finish by June 2017.

We will keep you informed of the progress and let you know when the playground construction dates are confirmed.

 

Recently Completed Playground Upgrades

  • Anula Regional Playground in Yanyula Park
  • Moil Park (next to Moil Oval)
  • Greenwood Park (Yeadon Circuit, Greenwood Crescent, Moil)
  • Brazil Park (Brazil Crescent, Karama)
  • Parkside Park, Leanyer
  • Holzerland Park, Malak
  • Whittle Park, Karama
  • Sunset Park, Nightcliff